Architecture

General designing comment: Finishing schedules for building one designs is usually modified by the construction team during work, according to several reasons which could be avoided by considering a few major factors that are usually ignored, for instance: the geographical location , climate , local culture , domestic building materials , owner's system and usage of the building and their habits. The designer must have adequate knowledge about the above mentioned factors, insufficient knowledge provides the construction team with the reasons to modify the design and nothing else.