Friday, February 04, 2005

Industerial Structure

Concrete Structures First of all I’d better have a few words about Excavation and that is If we’re going to excavate down to a level, i.e. -2.50, I think its better to stop it at -2.30 and do the rest manually. So we’d have a better bedding for the lean concrete that with less compaction would give you a more reliable surface. The next step is the Lean concrete which would be better to be done using ( C15 ) concrete although it is just a layer to separate soil from the elements of the structure. Next you’ll be doing the Bar bending which I advise you to put precast concrete pieces with the thickness (5~7 cm.) under the steel bars on the lean concrete and also allow this much concrete to cover on top of bars and in your calculations it really is better to multiply the above loads by 1.5 for better confidence and more reliability. It doesn’t really cost more than it does. I would be saying more in the days to come and they would be about structure till I’d be satisfied and think its enough. Ghassemee

Industerial Structure

Architecture---- CONCRETE INDUSTRIAL STRUCTURES Hi, Pals Structural drawings may be rough but it has its own miscellaneous Details which I’m sure they’re worthy to be paid attention to: First of all it’s not a house I’m gonna write about it’s a coke making Plant and the reason is because I’m tied to it at the present. In my previous works I’ve earned the trust by executing the project Exactly by the scheduled timing and I’m proud of that, but in this Project I’m afraid cause there are two walls of misfortune I’m Facing, although there’s a powerful support whom the owners’ Project manager he is, but after I explain the two walls you’ll judge My situation and be so kind enough to let me know: ghassemee@hotmail.com The first wall is the foreign consultant and supervisor who are Chinese ( the country I love so much ) In a way they act confusingly by their drawings and so called letters of recommendations I don’t know if they refer to read their previous letters when they’re gonna send another it’s even funny sometimes when you compare the sayings in the letters I’ll pay to those later on but in case you’ll Promise not to laugh but have pity for me. The other is the Iranian consultant which in such a situation is full of ignorance. One thinks as if they don’t really have the decision to Finalize the project. I can say the amount of each day’s work all these people do (about 20 people) can be done by two and of course very better. These are the reasons why I’ll be writing about concrete structure in my next few posts. Wish you all the good Ghassemee